This file comes from BOM when you download data from their web interface.
Quality Codes
-
10
quality-A
The record set is the best available given the technologies, techniques and monitoring objectives at the time of classification.
-
90
- quality-B
- The record set is compromised in its ability to truly represent the parameter.
-
110
- quality-C
- The record set is an estimate.
-
140
quality-E
The record set’s ability to truly represent the monitored parameter is not known.
-
210
quality-F
The record set is not of release quality or contains missing data.
Rainfall specific Quality Codes
- 130
- zero-rainfall
- The record set has no measurement recorded over the period the aggregated total is calculated.
Interpolation Types
-
101
Continuous data points - No interpolation
Spot samples, irregular sparse readings (such as groundwater readings or staff gauge readings). There is no expression possible between 2 values.
-
102
Continuous data points - Linear interpolation
Instantaneously recorded, continuous time series data.
-
103
Continuous data points - Constant until next time stamp
Mean value or constant instantaneous value. Examples for means are water level, flow recorded as mean values and examples for constant instantaneous values are pump rates and gate settings.
-
104
Continuous data points - Constant since previous time stamp
Mean value related to the end of interval.
-
201
Continuous totals - No interpolation
Tipping buckets, between two tips a zero-total is returned.
-
202
Continuous totals - Linear interpolation
Instantaneously recorded continuous time series data.
-
205
Continuous totals - Linear until next time stamp
A total value that is stored at the beginning of the totalling interval. The total itself is assumed to grow linear until the next value.
-
206
Continuous totals - Linear since previous time stamp
A total value that is stored at the end of the totalling interval. The total itself is assumed to grow linear since the previous value.
-
301
Continuous Directional Values - No interpolation
Spot samples of directions (such as wind direction).
-
302
Continuous Directional Values - Linear interpolation
Direction measurements with linear interpolation. The value type .directional. expresses the wrap at 360 degrees.
-
303
Continuous Directional Values - Constant until next time stamp
Constant direction until next time stamp of direction measurement (such as gate setting).
-
304
Continuous Directional Values - Constant since previous time stamp
Constant direction since previous time stamp of direction measurement (such as gate setting).
-
403
Aggregated Minimum - Constant until next time stamp
The minimum is representative for the observation interval. The interval main time stamp is equidistant and is stored at the beginning of the interval.
-
404
Aggregated Minimum - Constant since previous time stamp
The minimum is representative for the observation interval. The interval main time stamp is equidistant and is stored at the end of the interval.
-
503
Aggregated Maximum - Constant until next time stamp
The maximum is representative for the observation interval. The interval main time stamp is equidistant and is stored at the beginning of the interval.
-
504
Aggregated Maximum - Constant since previous time stamp
The maximum is representative for the observation interval. The interval main time stamp is equidistant and is stored at the end of the interval.
-
603
Aggregated Means - Constant until next time stamp
The interval main time stamp is stored at the beginning of the interval. The mean is representative until the next time stamp.
-
604
Aggregated Means - Constant since previous time stamp
The interval main time stamp is stored at the end of the interval. The mean is representative since the previous time stamp.
-
703
Aggregated Totals - Constant until next time stamp
The interval main time stamp is stored at the beginning of the interval. The total is representative until the next time stamp.
-
704
Aggregated Totals - Constant since previous time stamp
The interval main time stamp is stored at the end of the interval. The total is representative since the previous time stamp.